Tagline

Ezbordercrossing.com

Header 728×90 ad space

Select Page

Southeastern BC Road Conditions

Below are the current road condition alerts on provincially maintained highways in Southeastern British Columbia. This area covers the Porthill / Rykerts, and Eastport / Kingsgate border crossings in Idaho, and Roosville / Grasmere in Montana. This can be a very long list in the winter months.

This real-time list is provided by the Province of British Columbia and shows road conditions, traffic incidents, events, and major construction that impact the provincial roadways. We have a separate page for road conditions in Idaho.

Southeastern British Columbia Road Conditions
Highway 1 Both DirectionsHighway 1, in both directions. Rock scaling at Yoho National Park 20 km west of Field. Until Fri Oct 25. From 9:00 AM to 1:00 PM MDT on weekdays and Saturday. 24/7 work zone. A larger blast requiring an extended closure may occur with possible delays up to 90 mins. Other times 30 min delays. Reduced speed zones. Be prepared to stop. Watch for truck traffic and obey all signs and traffic control personnel. No stops on long weekends. Last updated Sat Jun 15 at 10:09 PM MDT. (DBC-6641)
Highway 1Highway 1. Road construction work between Donald Rd and Forde Station Rd for 5.0 km (23 to 18 km west of Golden). Until Mon Jul 15. From 6:00 AM to 7:00 PM MDT on weekdays and Saturday. Expect minor delays. Please obey construction speed limits and traffic control personnel. Last updated Fri May 31 at 10:20 AM MDT. (DBC-7076)
Highway 1 Both DirectionsHighway 1, in both directions. Electrical maintenance between MacDonald Showshed and Lanark Snowshed for 1.4 km (2 to 1 km west of West Boundary of Glacier National Park). Until Fri Jun 28. From 9:00 PM to 7:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Snowshed lighting replacement project. Night Work only, 7pm to 7am, Monday night to Sunday morning. Last updated Mon Jun 17 at 7:08 PM PDT. (DBC-7971)
Highway 1 Both DirectionsHighway 1, in both directions. Construction work at Illecillewaet Campground (3 km west of Rogers Pass Summit). Until Thu Aug 1 at 7:00 PM PDT. From May until August, expect road construction in the Illecillewaet Curve (24km from the park east boundary) and paving of a 10 km section daily from 7am-7pm. Expect speed reductions to 50 km/hr, lane closures, and delays up to 20 minutes. No work on long weekends. Last updated Sat Jun 15 at 9:09 PM PDT. (DBC-8339)
Highway 23Highway 23. Utility work between Mt Begbie Rd and Big Eddy Rd for 1.8 km (Revelstoke). Until Wed Jul 31. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Fri May 17 at 5:27 PM PDT. (DBC-8289)
Highway 23 Both DirectionsHighway 23, in both directions. Rock scaling between Revelstoke Dam Access Rd and Wallis Rd (Revelstoke). Until Fri Jun 28. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Rock Scaling at Revelstoke Dam. Last updated Mon Jun 10 at 1:31 PM PDT. (DBC-9167)
Highway 3Highway 3. Bridge construction between Fernie Ski Hill Rd and Vanlerberg Rd (3 km west of Fernie). Until Fri Nov 15. From 7:00 AM to 7:00 PM MDT daily. Expect minor delays. Please obey construction speed limits and traffic control personnel. Last updated Tue Apr 23 at 9:38 AM MDT. (DBC-7381)
Highway 93 Both DirectionsHighway 93, in both directions. Bridge maintenance between Kootenay National Pk and Marble Canyon Campground (7 km south of British Columbia and Alberta Border). Until Mon Jun 24. Expect speed reduction to 30km/h and travel on a detour bridge. Last updated Wed May 1 at 2:21 PM MDT. (DBC-3830)
Highway 3Highway 3. Bridge construction between Paulson Detour Rd; Paulson Detour Rd and Paulson Detour Rd; Paulson Detour Rd (15 km east of Christina Lake). Until Fri Nov 15. Single lane alternating traffic. Monday to Sunday: 24 hours per day Lane width reduced to 4.2 meters. Last updated Fri May 31 at 10:12 AM PDT. (DBC-6980)
Highway 3Highway 3. Construction work between College Creek FSR and Mannix Rd (2 km west of Castlegar). Until Fri Jul 26. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays. Watch for equipment and reduced speed zones. Last updated Fri May 31 at 12:56 PM PDT. (DBC-8664)
Highway 31Highway 31. Paving operations between Woodbury Village Rd and Kootenay Lake Provincial Pk for 38.4 km (16 km south of Meadow Creek to 14 km south of Kaslo). Until Sat Aug 17. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays up to 20 mins. Reduce speed on milled surfaces. Watch for crew and equipment, obey all signs and traffic control. Last updated Sat Jun 8 at 1:43 AM PDT. (DBC-9105)
Highway 3BHighway 3B. Ditching between Kirkup Ave and Highway 3; Highway 3 Jct W for 27.0 km (Rossland to 8 km north of Nancy Greene Summit). Until Fri Jun 28 at 3:00 PM PDT. From 6:30 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Last updated Mon Jun 24 at 10:13 AM PDT. (DBC-9580)
Click an icon below to print, email, or share this page with friends, family, or colleagues: