Tagline

Ezbordercrossing.com

Header 728×90 ad space

Select Page

Southwestern BC Road Conditions -Text

Below are the current road condition alerts on provincially maintained highways in Southwestern British Columbia. This area includes the following border crossings: Point Roberts, Peace Arch, Blaine / Surrey, Lynden / Aldengrove, and Sumas / Huntingdon.

This list is provided by the Province of British Columbia and shows road conditions, traffic incidents, events, and major construction that impact the provincial roadways.

Southwestern BC Road Conditions
Highway 1 Both DirectionsHighway 1, in both directions. Construction work between Exit 90: McCallum Rd and Gibson Rd Uturn for 35.9 km (Abbotsford to Chilliwack). Fraser Valley Variable Speed Limit System construction July 30, 2018 until May 31, 2019. In effect nightly from 8pm-5am, no work will be conducted on long weekends. The speed limit in the construction zone is 70 km/hr. Please drive with care and watch for roadside workers. Last updated Mon Feb 18 at 2:23 PM PST. (DBC-1166)
Highway 1Highway 1. Utility work planned between Emory Creek Rd and Emory Creek Campground for 1.9 km (4 to 6 km west of Yale). Starting Wed Apr 24 at 9:00 AM PDT until Wed Apr 24 at 4:00 PM PDT. Last updated Mon Mar 18 at 4:47 PM PDT. (DBC-6295)
Highway 1 EastboundHighway 1, eastbound. Utility work between Cottonwood Rd and Pfenniger Rd (23 km west of Jackass Mountain Summit). Until Thu Apr 25. From 10:00 AM to 4:00 PM PDT on weekdays. Lane Closure. Watch for traffic control. Last updated Fri Apr 12 at 1:27 PM PDT. (DBC-7116)
Highway 1 Both DirectionsHighway 1, in both directions. Road construction work at Exit 21: Mountain Hwy (North Vancouver - District). Until Fri May 10. Lane closures both directions 11pm-5am, including on-ramps & off-ramps, April 23-27, Apr 28-May 3, May 4-10 as required. Westbound Hwy 1 Exit 22A closed, alternate routes in effect. Note: Hwy 1 CLOSED Apr 27-28, May 3-5 at Mountain Hwy underpass for Demolition Works between 11pm-5am. Detour will be in effect. Last updated Tue Apr 23 at 7:05 AM PDT. (DBC-7186)
Highway 1 WestboundHighway 1, westbound. Vehicle incident between Dyke Crest Rd and Exit 104: No 3 Rd (Abbotsford). Lane blocked. Assessment in progress. Expect delays. Last updated Mon Apr 22 at 1:56 PM PDT. (DBC-7351)
Highway 10 EastboundHighway 10, eastbound. Utility work between 160 St and 168 St (Surrey). Until Tue Apr 30 at 5:00 AM PDT. From 8:30 PM to 5:00 AM PDT daily. Right lane closed. No lane closures the day before or the day following a statutory holiday. Last updated Sun Mar 31 at 10:43 AM PDT. (DBC-6704)
Highway 101 Both DirectionsHighway 101, in both directions. Special event planned between Sutherland Ave and Joncas Pl for 0.2 km (Powell River). Starting Fri May 17 at 9:15 AM PDT until Fri May 17 at 9:45 AM PDT. Road closure planned. Watch for traffic control personnel. Annual James Thompson Elementary May Day Parade in Powell River. Watch for signage, traffic control and to drive with caution through the parade route area. Next update time Fri May 17 at 9:45 AM PDT. Last updated Sun Mar 17 at 12:46 PM PDT. (DBC-6139)
Highway 101Highway 101. Road construction work between Malaspina Rd and Dinner Rock Rd for 0.7 km (14 to 15 km west of Powell River). Until Fri May 10. From 7:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic. Possible delays. Construction speed zone of 50km/hr. No work will be conducted on Friday, April 19 or Monday, April 22. Last updated Wed Apr 17 at 9:26 AM PDT. (DBC-6840)
Highway 13Highway 13. Road construction work between 264 St and 8 Ave (Langley - District). Until Thu Oct 31, 2019. From 7:00 AM to 7:00 PM PST daily. Last updated Tue Dec 11 at 11:15 AM PST. (DBC-3962)
Highway 17 EastboundHighway 17, eastbound. Maintenance at 11100 Block of River Road in Delta. Single lane alternating traffic. The EB lane between 92A Ave. And Knudson Rd remains closed due to retaining wall washout. Permanent repair work this spring; interim repair soon. Expect some delays. Single Lane alternating traffic 24 hrs a day, 7 days a week for safety. Drive with caution. Contact knudson.Wallrepair@gov.Bc.Ca for updates. Last updated Thu Jan 31 at 3:13 PM PST. (DBC-1660)
Highway 17A Both DirectionsHighway 17A, in both directions. Utility work between 34B Ave and Highway 10 for 2.7 km (Delta). Until Fri May 31 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST daily. Shoulder closed. Last updated Mon Mar 4 at 1:38 PM PST. (DBC-5869)
Highway 3 Both DirectionsHighway 3, in both directions. Road maintenance work between Highway 1 and Exit 177: Highway 5 for 3.8 km (Hope). Until Fri May 31, 2019. From 7:00 AM to 5:00 PM PST daily. Fraser Valley Variable Speed Limit System construction. No work on long weekends; please watch for roadside workers. Last updated Tue Dec 25 at 7:59 PM PST. (DBC-1177)
Highway 3 WestboundHighway 3, westbound. Tree pruning between Second Avalanche Gate and Sunshine Valley for 7.2 km (25 to 17 km east of Hope). Until Fri May 10. From 7:30 AM to 4:00 PM PDT on weekdays. Shoulder closed. Last updated Mon Apr 15 at 11:56 AM PDT. (DBC-7181)
Highway 7 Both DirectionsHighway 7, in both directions. Construction work between Silverdale Ave and Nelson St for 3.6 km (Mission). Until Fri Nov 29, 2019. From 9:00 AM to 3:30 PM PST daily. Expect delays. Please watch for signage and obey all traffic control personnel. Use alternate routes where available. Please note that for the duration of construction the lane widths will be 3.5m. Last updated Fri Nov 23 at 12:29 PM PST. (DBC-1593)
Highway 7 WestboundHighway 7, westbound. Utility work planned between Fielder Rd and Mill Rd for 0.1 km (Kent). Starting Mon Apr 29 until Fri May 3. From 9:00 AM to 3:00 PM PDT on weekdays. Maintenance planned. The curb/outside lane will be effected. Last updated Thu Apr 18 at 11:21 AM PDT. (DBC-7305)
Highway 99 NorthboundHighway 99, northbound. Paving operations planned at Exit 32: Steveston Hwy (Richmond). Starting Wed Apr 24 at 9:30 PM PDT until Thu Apr 25 at 12:30 AM PDT. Lane will be blocked. Right lane blocked. Last updated Wed Apr 24 at 5:49 AM PDT. (DBC-7415)
Highway 99 SouthboundHighway 99, southbound. Paving operations planned at Blundell Rd (Richmond). Starting Wed Apr 24 at 11:00 PM PDT until Thu Apr 25 at 5:00 AM PDT. Lane will be blocked. Bus/HOV Lane blocked. Last updated Wed Apr 24 at 5:53 AM PDT. (DBC-7416)
Other RoadsHighway 91 Connector. Highway 91 Connector. Maintenance planned at Nordel Way Truck Parking lot. Starting Sat Apr 27 at 6:00 AM PDT until Sun Apr 28 at 6:00 PM PDT. Closed to all vehicle traffic for maintenance, any vehicles left in the lot will be towed at owners expense. Additional parking will be provided at Hwy 91 northbound pullout between 58 & 64th Ave. Last updated Tue Apr 9 at 11:50 AM PDT. (DBC-6421)
Click an icon below to print, email, or share this page with friends, family, or colleagues: