Tagline

Ezbordercrossing.com

Header 728×90 ad space

Header 728×90 ad space

Select Page

Laurier / Cascade

Laurier/ Cascade (Christina Lake) – US Hwy 395/ BC Hwy 395

Traffic Camera for Laurier / Christina Lake Border Crossing

Camera showing US 395 at the Canadian Border. Source: WDOT


Current Weather for the Laurier / Christina Lake border crossing

This is a very remote rural border crossing used mainly by vacation travelers.

Laurier / Cascade Port Information

  • Hours of Operation – Daytime service only – 8:00am to Midnight
  • The hours of operation for border crossings with limited service hours such as this one can change so you may want to call the border office or otherwise confirm it’s hours of operation.
  • You can get customized traffic information for Washington over the phone using the 511 system. Simply dial 5-1-1 and say “traffic”.   If you cannot dial 511 on your phone you can also use the toll-free number 1-800-695-7623
  • To hear current road conditions in British Columbia you can call (800)-550-4997.
  • GPS coordinates – Latitude & Longitude: 49.000350, -118.223802
  • Send us YOUR tips about this port.

Map of Laurier / Christina Lake Border Crossing Area

Traffic information is shown on the map if available.  This map is interactive so you may zoom in or out.  Drag the orange “man” to the map to see a street view if available in this area. You can get directions to this border crossing by clicking on the “Directions” link below the map.

Center map
Traffic
Bicycling
Transit
Lurier / Christina Lake Border Crossing

Telephone Numbers for the Border Customs Offices at Laurier / Cascade

  • Laurier U.S. Customs Office Telephone Number: (509) 684-2100
  • To contact Canadian Customs or other border services at this port call the Canadian Border Information Service (BIS) which can answer your questions or transfer you directly to the Canadian port.

Current Road Conditions in Washington and British Columbia

We have special pages showing all current road advisories for the State of Washington and the province of British Columbia. These pages show problems such as roadway accidents, snow or ice, lane closures or blockages, construction, road restrictions, traffic problems, and roadwork around the border crossing.

Traffic Alerts for Northeast Washington

Below are the travel alerts issued by the Washington State Department of Transportation for Northeast Washington which includes the area around the border crossing. This reports all major accidents, weather related problems, construction and other events that may affect your travel.

HIGH IMPACT
SR 291 Both Directions - Survey operations on SR 291 northbound from milepost 9.0 near Nine Mile Rd to milepost 14.0 beginning at 10:00 am until about 2:00 pm on Wednesday, September 19, 2018. Flagging controlled operations with one-lane, two-way traffic. Expect delays up to 15 minutes. Last Updated: 9/14/2018 2:58 PM More Info
From milepost 9 to milepost 14
HIGH IMPACT
US 395 Both Directions - Motorists should expect construction delays. Last Updated: 9/13/2018 11:52 AM More Info
From milepost 179 to milepost 181
MODERATE IMPACT
SR 290 Both Directions - Daytime work with lane closures and nighttime work for paving between 6 pm and 6 am. Last Updated: 9/13/2018 11:56 AM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
I-90 Westbound - Construction continues on the Hamilton/SR290 on-ramp to WB 90. The on-ramp is closed until further notice. Travelers will have several detour options to access westbound I-90 from Hamilton during this closure, though some depend on vehicle height. Last Updated: 8/9/2018 4:31 PM More Info
At milepost 282
MODERATE IMPACT
US 2 Both Directions - Construction on US 2 both directions from milepost 297.0 near Deer Rd to milepost 299.9 near Colbert Rd. Roadway users should be alert for possible lane restrictions during non-commute hours, Monday through Friday. Last Updated: 7/26/2018 4:55 PM More Info
From milepost 297 to milepost 300
MODERATE IMPACT
US 395 Both Directions - Construction on US 395 both directions from milepost 190.3 near R063 0 to milepost 206.7 near Chewelah us underway until further notice. Daytime work with lane closures. Last Updated: 7/23/2018 3:51 PM More Info
From milepost 190 to milepost 207
MODERATE IMPACT
Mission Av Both Directions - Mission Ave will be closed from Flora Rd to Barker Rd for road work beginning June 20, 2018 until October 31, 2018. Select alternate route. Last Updated: 6/29/2018 8:20 AM More Info

MODERATE IMPACT
SR 21 Both Directions - SR 21 milepost 145.5 at Gold Creek, 17 miles south of Republic has a one-lane bridge with a 10 mile per hour speed limit until further notice. Follow traffic control in place and yield to on-coming traffic. Last Updated: 11/28/2017 10:08 AM More Info
At milepost 146
LOW IMPACT
Little Spokane Dr Northbound - Spokane County: Install County sewer on Little Spokane Drive from Little Spokane from Little Spokane Lane to Shady Slope Rd. Little Spokane Drive will be closed at shady slope Rd until the end of October 2018. Expect delays and use other routes. Last Updated: 9/11/2018 3:06 PM More Info

LOW IMPACT
Liberty Dr Northbound - Spokane County: Starting on September 12, 2018, the County will have lane closures for removing and replacing pavement. Watch for flaggers and be prepared to stop. This project is scheduled through the end of October.
Expect delays Last Updated: 9/11/2018 2:52 PM More Info

LOW IMPACT
Whitworth Dr Northbound - Spokane County: Starting on September 12, 2018, the County will have lane closures on Whitworth Dr. from Hawthorne Rd to Wall Street, for removing and replacing pavement. Watch for flaggers and be prepared to stop. This project is scheduled through the end of October.
Expect delays Last Updated: 9/11/2018 2:42 PM More Info

LOW IMPACT
Regal Rd Both Directions - Spokane County: Starting on September 12, 2018, the County will have lane closures for removing and replacing pavement. Watch for flaggers and be prepared to stop. This project is scheduled through the end of October.
Expect delays Last Updated: 9/11/2018 2:37 PM More Info

LOW IMPACT
Bigelow Gulch Rd Both Directions - Spokane County: Improvement of the Bigelow Gulch Corridor connecting Forker Road to Progress Road via a new alignment north of the existing intersection. Expect delays. No truck traffic, truck traffic violators will be ticketed.
This work is expected to continue through December 31, 2018. Last Updated: 9/4/2018 12:11 PM More Info

LOW IMPACT
Sunset Both Directions - City of Spokane: Sunset Blvd is reduced to one lane in each direction from Royal to Lindeke Street for grinding and paving. Expect delays. Last Updated: 8/19/2018 6:38 PM More Info

LOW IMPACT
Sprague Westbound - City of Spokane: Sprague Ave is closed Westbound between Jefferson Street and Cedar Street for road work on the combined sewer overflow. Expect delays. Last Updated: 8/19/2018 6:23 PM More Info

LOW IMPACT
Sharp Both Directions - City Of Spokane: Sharp Avenue is closed between Ruby and Hamilton Street for road work beginning June 22 until further notice. Last Updated: 8/19/2018 6:16 PM More Info

LOW IMPACT
Spokane Falls Both Directions - City Of Spokane - Spokane Falls Boulevard closed for utility construction from Lincoln to Monroe Streets with a signed detour in place. Lincoln St access to River Park Square parking garage is open. Last Updated: 8/19/2018 3:34 PM More Info

LOW IMPACT
Martin Luther King Jr. Both Directions - City Of Spokane - MLK Jr. Way is closed from Pine to Sherman Street. A detour is in place for the U District Pedestrian Bridge Project until further notice. Last Updated: 8/19/2018 3:32 PM More Info

LOW IMPACT
Monroe Rd Both Directions - Spokane County: Starting on Monday, May 14, 2018, Monroe Road will be closed at Dragoon Creek for bridge replacement. Motorist should use other routes. This project is scheduled until Oct. 31st 2018. Last Updated: 8/19/2018 2:46 PM More Info

LOW IMPACT
Palouse Hy Northbound - Spokane County will have lane restrictions for road improvements including sidewalks, curb ramps, storm sewer, and landscaping. Please watch for flaggers, there will be delays. This project is schedule through the end of November 2018. Last Updated: 8/19/2018 2:41 PM More Info

LOW IMPACT
US 2 Both Directions - US 2 is reduced to one lane in each direction with slow traffic, congestion, and possible delays. Last Updated: 4/26/2018 10:56 AM More Info
From milepost 295 to milepost 296
LOWEST IMPACT
US 395 Both Directions - Construction on US 395 Spur - NSC both directions at the Freya Roundabouts Monday - Friday 6:00 am to 4:30 pm. Roadway users should be alert for occasional traffic control. Last Updated: 8/2/2018 12:51 PM More Info
At milepost 164
LOWEST IMPACT
SR 21 Both Directions - Construction on SR 21 both directions from milepost 74.0 near MP Marker 74 to milepost 91.8 near SR 2 until further notice. Roadway users should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway. Last Updated: 7/26/2018 5:16 PM More Info
From milepost 74 to milepost 92

Click an icon below to print, email, or share this page with friends, family, or colleagues: