Menu

Southwestern BC Road Conditions -Text

 

Below are the current road condition alerts on provincially maintained highways in Southwestern British Columbia. This area includes the following border crossings: Point Roberts, Peace Arch, Blaine / Surrey, Lynden / Aldengrove, and Sumas / Huntingdon.

This list is provided by the Province of British Columbia and shows road conditions, traffic incidents, events, and major construction that impact the provincial roadways.

Southwestern BC Road Conditions
Highway 1 Westbound Road Paving on Highway 1 Westbound on the Vedder Bridge will be in effect Friday July 21 2017 at 8:00 PM until Saturday July 22 2017 at 9:00 AM and Saturday July 22 2017 at 8:00 PM until Sunday July 23 2017 at 9:00 AM, with a width restriction of 3.8 metres on the Bridge. Updated on Tue Jul 18 11:23 am PDT. (ID# RTMC_14170)
Highway 99 Both directions The Whistler/Pemberton Ironman Triathlon will take place on Sunday, July 30, 2017. To ensure safety, travellers are advised to expect delays and clossures on Highway 99 between Whistler and Pemberton from 7 a.m. until approximately 5:30 p.m. Additional closures will be in effect on Callaghan Valley Road and Pemberton Meadows Road during the event. As this area is part of the emergency evacuation route for wildfires, highway closures will not be maintained for the event in the case of an evacuation and, instead, will remain open to evacuees. Please check Drive BC for the latest information. Highway 99 (Sea to Sky): Vancouver to Whistler northbound: Highway 99 northbound open all day to Alpine Way, four kilometres north of Whistler Village. No left turns permitted off Highway 99 between Callaghan Valley Road and Alpine Way from 7 a.m. to 12:30 p.m. Expect minor delays on Highway 99 northbound Whistler to Pemberton northbound: Highway 99 northbound closed from Alpine Way, four kilometres north of Whistler Village, to Pemberton between 8:45 and 1:30 p.m. Whistler to Vancouver southbound: Highway 99 southbound closed from Alpine Way, four kilometres north of Whistler Village, to Callaghan Valley Road between 7 a.m. and 1 p.m. Pemberton to Whistler southbound: Highway 99 southbound closed from Portage Road in Pemberton to Alpine Way four kilometres north of Whistler Village from 11:00 a.m. to 4:30 p.m. Highway 99 southbound closed between Alpine Way and Village Gate Boulevard 7:00 a.m. to 5:30 p.m. Use detour routes after 1:00 p.m. Local Roads: Callaghan Valley Road to Whistler Olympic Park closed from 7 a.m. to noon Pemberton Meadows Road northbound closed from 9:30 a.m. to 3:00 p.m. Pemberton Meadows Road southbound closed from 10:30 a.m. to 3:30 p.m. Travellers are advised to plan their trip well in advance, allow extra time and use alternative routes where possible. Updated on Thu Jul 20 8:55 pm PDT. (ID# RTMC_14235)
Highway 99 Southbound Paving operations on the Oak St Bridge will be in effect overnights from 21/07/2017 to 23/07/2017 between 10:00 PM and 8:00 AM. Single lane traffic in each direction on the northbound section, while southbound will be closed for paving. Speed through this corridor will be 50 km/h enforced by police. Updated on Thu Jul 13 8:27 pm PDT. (ID# RTMC_14161)
Highway 1 Both directions Single lane alternating traffic at various locations for mowing on Highway 1 from Yale to Jackass Mountain in effect 5:00 AM to 3:00 PM daily 20/07/2017 through 23/07/2017. Updated on Wed Jul 19 7:14 am PDT. (ID# RTMC_14206)
Highway 1 Both directions Maintenance at Cassiar Tunnel will be in effect 11pm until 5am Friday July 21, 2017. Lane closures will be in effect. Updated on Thu Jul 20 4:39 am PDT. (ID# RTMC_14135)
Highway 1 Both directions Landscaping on Highway 1 in both directions at Boston Bar to Alexandra Bridge will be in effect daily from July 17, 2017 until July 20, 2017 from 5:00 AM to 2:30 PM. Single lane alternating traffic will be in effect, expect delays. Updated on Thu Jul 13 7:31 am PDT. (ID# RTMC_14144)
Highway 1 Both directions Bridge deck rehabilitation and seismic safety retrofit on Highway 1 in both directions 3 km north of Spuzzum at the Alexandria Bridge. Construction will be in effect 24 hours a day from 23/05/2017 through 31/10/2017. Traffic will be single lane alternating for the duration of the project. Updated on Fri Jul 7 3:34 pm PDT. (ID# RTMC_13538)
Highway 1 Eastbound Road Maintenance on Highway 1 Eastbound from the Iron Worker Bridge to the Cassiar Tunnel. Road Maintenance will be in effect today until July 19, 2017 at 5:00 AM. Updated on Tue Jul 18 8:24 pm PDT. (ID# RTMC_14203)
Highway 1 Eastbound Road Work on Highway 1 Westbound and Eastboundbetween American Creek bridge & Golden Creek Bridge starting July 13 from 7:00 AM - 7:00 PM. Updated on Tue Jul 11 2:52 pm PDT. (ID# RTMC_14120)
Highway 1 Eastbound Road Maintenance on Highway 1 Eastbound at 208th St. will occur weekly on all days effective 14/07/2017 until 31/12/2017 from 12:00 AM to 11:59 PM. HOV lane closure will be in effect 24 hours a day. This is for the 208th St Township of Langley project. Updated on Fri Jul 14 1:37 pm PDT. (ID# RTMC_14168)
Highway 1 Westbound Road Work on Highway 1 Westbound from Prest Road to Number 1 Road will occur on Wednesday, Thursday and Friday effective 19/07/2017 until 21/07/2017 from 10:00 PM to 5:00 AM. Updated on Tue Jul 18 11:47 am PDT. (ID# RTMC_14197)
Highway 101 Eastbound Annual Sea Cavalcade Parade on Highway 101 both directions from Payne Rd/Pratt Rd to North Rd on July 29 2017 10:30 AM to 1:30 PM. Temporary detour to and from Langdale Ferry Terminal along Reed Rd and Payne Rd. Other temporary detours in effect via residential streets. Motorists to obey all signs and traffic control persons, drive with caution near the parade route and detour area. Updated on Wed Jul 19 11:56 am PDT. (ID# RTMC_14212)
Highway 101 Westbound Annual Sea Fair Parade on Highway 101 both directions from Warf St to Alberni St on July 22 2017 9:30 AM to 11:30 AM. Temporary detours in effect via residential streets. Motorists to obey all signs and traffic control persons, drive with caution near the parade route and detour area. Updated on Wed Jul 19 11:55 am PDT. (ID# RTMC_14213)
Highway 11 Southbound Utility Work on Highway 11 both directions from McClary Avenue to 6th Avenue will be in effect 7:00 am to 4:00 pm daily, Monday to Friday until 28/07/2017.Southbound right lane will be closed, drive carefully. Updated on Thu Jul 20 12:59 pm PDT. (ID# RTMC_14122)
Highway 13 Northbound Langley Good Times Cruise-In on Highway 13 at Fraser Highway eastbound turn lane closures will be in effect September 9th, 2017 at 4:45 AM until 7:00 PM. Please obey traffic control personnel and signage. Updated on Tue Jun 27 11:30 am PDT. (ID# RTMC_13976)
Highway 17 SFPR Eastbound Surveying on Highway 17 Eastbound east of 80th St until 3:00 PM today, right lane closed. Drive carefully. Updated on Thu Jul 20 9:28 am PDT. (ID# RTMC_14225)
Highway 17 SFPR Eastbound Road Work on Highway 17 Eastbound after 80th St Connector will occur weekly on Monday to Friday effective Monday 05/06/2017 until Friday 01/09/2017 from 9:00 AM to 3:00 PM. Updated on Mon Jun 5 11:30 am PDT. (ID# RTMC_13717)
Highway 17 SFPR Northbound Road Work on Highway 17 between 52 Street and Salish Sea Drive will occur weekly on Monday to Friday effective 19/06/2017 until 02/08/2017 from 7:00 AM to 3:30 PM. Updated on Tue Jun 20 9:57 am PDT. (ID# RTMC_13872)
Highway 17 SFPR Westbound Road Work on Highway 17 Westbound just east of 80 St. 1 left lane closure will be in effect today at 9:00 PM until 11:59 PM. Updated on Wed Jul 19 9:07 pm PDT. (ID# RTMC_14220)
Highway 3 Both directions Road work on Highway 3 in both directions at Alison Pass summit will be in effect from 8:00 AM to 4:00 PM July 17, 2017 until July 20, 2017. Single lane alternating traffic in effect, expect delays. Updated on Tue Jul 18 6:56 pm PDT. (ID# RTMC_14201)
Highway 3 Both directions Bridge Work on Highway 3 between Upper Cambie/Similkameen Bridge and Allison Pass will occur weekly on Monday to Friday effective 09/05/2017 until 30/08/2017 from 7:00 AM to 7:30 PM. The work may include some Saturdays as required. Closures will be single lane alternating for no longer than 5 minutes as needed. Updated on Tue Jun 6 7:44 am PDT. (ID# RTMC_13556)
Highway 3 Eastbound Road Maintenance on Highway 3 both directions from exit 177 to the bottom of Nine Mile Hill July 19 2017 to July 20 2017 from 5:30 AM to 3:30 PM. Watch out for a slow moving vehicle in the right lane. Updated on Wed Jul 19 7:01 am PDT. (ID# RTMC_14192)
Highway 3 Eastbound Patching on Highway 3 both directions at Allison Pass Summit, single lane alternating traffic will be in effect July 19 2017 until 4:00 PM. Updated on Wed Jul 19 7:15 am PDT. (ID# RTMC_14208)
Highway 3 Eastbound Mountain Madness Trail running event occurring on and around Highway 3 Eastbound 24 hours a day from Cathedral Park to Skagit Valley Provincial Park from 10:00 AM August 11, 2017 until August 13, 2017 at 10:00 AM. Expect to see athletes along highway shoulders wearing high visibility vests. Updated on Mon Jul 17 5:50 pm PDT. (ID# RTMC_14189)
Highway 5 Northbound Road Maintenance on Highway 5 Northbound after Highway 3 between Othello and Sowaqua will be in effect daily, starting Friday 16/06/2017 at 8:00 AM until Thursday 30/11/2017 at 6:00 PM. Updated on Mon Jun 19 10:31 am PDT. (ID# RTMC_13852)
Highway 7 Both directions Removal of telecom poles on Highway 7 with minor delays in both directions from Malcolm Rd to Watkins Rd in Deroche will occur from July 17 to July 21, Monday to Thursday from 7:00 AM to 4:00 PM and Friday from 7:00 AM to 12 noon. Updated on Tue Jul 11 10:18 am PDT. (ID# RTMC_14117)
Highway 7 Eastbound Farm Cycle Tour on Highway 7 Eastbound frmo Bodnar Rd to Pioneer Avenue will be in effect 22/07/2017 at 8:30:00 AM until 6:30:00 PM. Expect minor delays. Watch out for cyclists on the road. Updated on Wed Jul 12 1:17 pm PDT. (ID# RTMC_14134)
Highway 7 Westbound Paving at the Deroche rail road crossing on Highway 7 July 18 2017 to July 21 2017 from 5:00 am to 5:00 PM. Single-lane alternating traffic, expect delays. Updated on Mon Jul 17 12:41 pm PDT. (ID# RTMC_14186)
Highway 7B Westbound Road Work on Highway 7B and Kingsway Ave will be in effect July 21 2017 from 12:00 AM until 2:00 AM. Lane closures in effect. Updated on Wed Jul 19 12:30 pm PDT. (ID# RTMC_14217)
Highway 7B Westbound Road Work on Highway 7B and Shaughnessy St will be in effect July 20 2017 and July 21 2017 from 9:00PM until 12:00 AM. Lane closures in effect. Updated on Wed Jul 19 12:26 pm PDT. (ID# RTMC_14216)
Highway 9 Both directions Road Work on Highway 9 on the Agassiz-Rosedale Bridge will be in effect July 20, 2017 at 11:00 PM until July 21, 2017 at 5:00 AM. The streetlights on the Bridge NB and SB are being relamped. Single lane alternating traffic in effect. Updated on Mon Jul 17 4:11 pm PDT. (ID# RTMC_14188)
Highway 91 Both directions Construction on Highway 91 & 72nd Ave Interchange Project will be in effect January 2017 to December 2018. Nightly single lane closure on Highway 91 between the hours of 9:00pm to 6:00am for the duration of the project. Updated on Tue May 30 3:40 pm PDT. (ID# RTMC_13668)
Highway 91 Southbound Road Work on Highway 91 Eastbound east of No.6 Rd. 1 left lane slow moving closure will be in effect today at 9:30 PM until 11:59 PM. Updated on Wed Jul 19 9:46 pm PDT. (ID# RTMC_14222)
Highway 99 Both directions Road Sweeping on Highway 99 both directions, watch out for a slow moving vehicle and accompanying vehicles. Sweeping will occur 24/7 in both directions from 15/07/2017 to 21/07/2017. Drive carefully. Updated on Fri Jul 14 9:52 pm PDT. (ID# RTMC_14171)
Highway 99 Both directions Landscape maintenance on Highway 99 both directions at Lions Bay on 17/07/2017 - 21/07/2017 from 7:30 AM to 5:30 PM. Left lane closed, both directions use caution. Updated on Fri Jul 14 5:02 pm PDT. (ID# RTMC_14169)
Highway 99 Northbound Filming on Horseshoe Bay Drive will occur July 27, 2017 at 5:00 AM until 7:00 AM. Drive carefully. Updated on Tue Jul 18 7:49 pm PDT. (ID# RTMC_14202)
Highway 99 Northbound Landscaping work on Highway 99 Northbound 700 metres south of Kelvin Grove Way until 3:00 PM today. Right lane closed, drive carefully. Updated on Thu Jul 20 8:44 am PDT. (ID# RTMC_14224)
Highway 99 Northbound Road Work on Highway 99 Northbound at Lions Bay, left lane closed. Drive carefully. In effect today until 3:30 PM. Updated on Tue Jul 18 8:12 am PDT. (ID# RTMC_14193)
Highway 99 Northbound Special Event on Highway 99 Northbound after Lillooet River Rd. Maximum 10 minute closures for traffic will take place July 17 2017 and July 18 2017 from 6:00 AM to 9:00 PM. Updated on Mon Jul 17 10:12 am PDT. (ID# RTMC_14185)
Click an icon below to print, email, or share this page with friends, family, or colleagues: