Below are the current road condition alerts on provincially maintained highways in Southwestern British Columbia. This area includes the following border crossings: Point Roberts, Peace Arch, Blaine / Surrey, Lynden / Aldengrove, and Sumas / Huntingdon.
When you finish with this page, go back to the British Columbia Road Conditions Menu to review other road and traffic condition sources we have collected. Also, be sure to review our information on going through customs, required documentation and prohibited items.
Text List of Travel Issues Along the Washington / British Columbia Border
This list is provided by the Province of British Columbia and shows road conditions, traffic incidents, events, and major construction that impact the provincial roadways.
Highway 1 Eastbound | Highway 1, eastbound. Vehicle incident at Exit 55: 192 St (Surrey). The off ramp from Highway 1 to 192nd Street remains closed. Highway 1 itself is open in both directions with all lanes available. The 192nd St overpass has single lane alternating traffic in effect with a weight restriction of 24,000kg in place. Next update time Tue Aug 16 at 9:00 AM PDT. Last updated Mon Aug 15 at 9:22 AM PDT. (DBC-43186) |
Highway 1 Both Directions | Highway 1, in both directions. Road construction work between Ainslie Rd N and Kanaka Station Rd for 16.1 km (Jackass Mountain Summit). Watch for traffic control. Expect delays. Loads over 3.8 metres in width restricted. Road open with sections of single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Tue Aug 16 at 3:15 AM PDT. Last updated Mon Aug 15 at 2:59 AM PDT. (DBC-35355) |
Highway 10 Both Directions | Highway 10, in both directions. Vehicle incident between 72 Ave and the end of Highway 10 for 0.3 km (Langley - District). Single lane alternating traffic. Watch for traffic control. 232nd street overpass operating at single lane alternating traffic until further notice. Weight restriction of 24,000kg in place. Next update time Mon Aug 22 at 1:00 PM PDT. Last updated Fri Jul 22 at 12:11 PM PDT. (DBC-43512) |
Highway 101 Both Directions | Highway 101, in both directions. Bridge construction between Powell Pl and Cedar St for 0.6 km (Powell River). Until Wed Aug 31. Single lane alternating traffic. Watch for traffic control. Truck and load dimensional restriction of 3.4m maximum. Next update time Wed Aug 31. Last updated Thu Jul 28 at 2:48 PM PDT. (DBC-43689) |
Highway 15 Both Directions | Highway 15, in both directions. Bridge construction between 176 St and 57 Ave (Surrey). Until Tue Nov 15 at 5:00 PM PDT. Lane closures in both directions in effect. Watch for traffic control. Expect delays. Northbound structure closed. Traffic reduced to a single lane in each direction on the southbound structure. Max width of 4.5m wide load restriction. Next update time Tue Nov 15 at 9:00 AM PDT. Last updated Mon Jul 25 at 12:43 PM PDT. (DBC-42673) |
Highway 1 Westbound | Highway 1, westbound. Construction work between Exit 7: Westridge Ave and Almondel Rd (West Vancouver). Until Tue Sep 6. From 7:00 AM to 7:00 PM PDT daily. Watch for traffic control. Westmount Road off ramp closure. Last updated Thu May 5 at 10:08 AM PDT. (DBC-40690) |
Highway 1 Westbound | Highway 1, westbound. Construction work between Exit 8: Cypress Bowl Rd and Exit 7: Westridge Ave for 1.5 km (West Vancouver). Until Wed Nov 16. From 10:00 PM to 5:00 AM PDT on weekdays. Expect minor delays. Watch for traffic control. Last updated Fri Jun 3 at 9:26 AM PDT. (DBC-41811) |
Highway 1 Both Directions | Highway 1, in both directions. Maintenance between Exit 7: Westridge Ave and Exit 8: Cypress Bowl Rd for 1.6 km (West Vancouver). Until Fri Aug 19. From 10:00 PM to 5:00 AM PDT daily. Two left lanes blocked. Expect delays. For median replacement work. Last updated Fri Aug 5 at 9:47 AM PDT. (DBC-43244) |
Highway 1 Eastbound | Highway 1, eastbound. Utility work between Exit 7: Westridge Ave and Exit 8: Cypress Bowl Rd for 0.6 km (West Vancouver). Until Mon Sep 26. From 10:00 AM to 2:00 PM PDT daily. Expect delays. Left lane will be periodically closed. Last updated Mon Jul 25 at 4:46 PM PDT. (DBC-43584) |
Highway 1 Westbound | Highway 1, westbound. Utility work between Exit 8: Cypress Bowl Rd and Exit 7: Westridge Ave for 1.5 km (West Vancouver). Until Sun Sep 18. From 10:00 AM to 5:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Fri Jul 22 at 11:05 AM PDT. (DBC-43510) |
Highway 1 | Highway 1. Maintenance at Exit 8: Cypress Bowl Rd (West Vancouver). Until Fri Sep 16 at 7:00 PM PDT. On ramp to Cypress Bowl road will be blocked. Last updated Thu Jul 14 at 1:26 PM PDT. (DBC-43250) |
Highway 1 Eastbound | Highway 1, eastbound. Paving operations between Port Mann Bridge and Golden Ears Way for 9.1 km (Surrey). Until Sat Oct 15 at 7:00 AM PDT. From 7:00 PM to 7:00 AM PDT daily. Lane closures will be in effect. Watch for traffic control. Last updated Sun Aug 14 at 12:41 PM PDT. (DBC-43995) |
Highway 1 Eastbound | Highway 1, eastbound. Shoulder maintenance between Exit 150: 160 St and Exit 53: 176th St / Highway 15 (Surrey). Until Wed Aug 31. From 7:00 PM to 10:00 AM PDT on Saturday and from 7:00 PM to 7:00 AM PDT on weekdays. Water main testing. Last updated Thu Aug 11 at 4:27 PM PDT. (DBC-44112) |
Highway 1 Eastbound | Highway 1, eastbound. Road maintenance work between Exit 66: 232nd St and 248 St (Langley - District). Until Wed Aug 31. From 10:00 PM to 9:00 AM PDT daily. Shoulder closed. Travel lanes will remain open with a speed reduction to 80 km/hour. Last updated Wed Jul 13 at 4:37 PM PDT. (DBC-43219) |
Highway 1 Both Directions | Highway 1, in both directions. Utility work between Exit 160: Hunter Creek Rd and Exit 168: Flood Hope Rd for 7.9 km (Hope). Until Fri Aug 19. From 9:00 AM to 4:00 PM PDT daily. Lane Closure. Expect delays. Last updated Tue Jul 12 at 10:48 AM PDT. (DBC-43163) |
Highway 1 Both Directions | Highway 1, in both directions. Utility work planned between Doolan Rd and Emory Creek Rd for 4.0 km (4 km north of Hope to 6 km south of Yale). Starting Mon Aug 22 until Fri Sep 2. From 8:00 AM to 4:00 PM PDT on weekdays. Lane Closure. Expect delays. Last updated Mon Aug 8 at 1:16 PM PDT. (DBC-43987) |
Highway 1 Both Directions | Highway 1, in both directions. Utility work between Doolan Rd and Emory Creek Rd for 3.9 km (4 km north of Hope to 6 km south of Yale). Until Fri Aug 19. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Expect delays. Last updated Wed Jul 20 at 3:20 PM PDT. (DBC-43013) |
Highway 1 Both Directions | Highway 1, in both directions. Bridge construction between Regent St and Toll Rd (Yale). Until Mon Oct 31. Road construction work. Single lane alternating traffic. Expect delays. Watch for traffic control. Speed reduced to 30km/h. Last updated Tue Mar 15 at 10:51 AM PDT. (DBC-38962) |
Highway 1 Northbound | Highway 1, northbound. Utility work between Boston Bar Station Rd and Kahmoose Rd for 11.7 km (14 to 26 km south of Jackass Mountain Summit). Until Fri Aug 19 at 4:00 PM PDT. Expect delays. Watch for traffic control. Crews will be working in the right lane. Last updated Tue Jul 19 at 12:29 PM PDT. (DBC-43391) |
Highway 10 Eastbound | Highway 10, eastbound. Maintenance between 124 St and 136 St for 2.5 km (Surrey). Until Mon Aug 29 at 3:00 PM PDT. Lane Closure. Last updated Fri Aug 12 at 8:06 AM PDT. (DBC-44121) |
Highway 10 Both Directions | Highway 10, in both directions. Road sweeping planned between 112 St and 176 St for 12.5 km (Surrey to Delta). Starting Mon Aug 15 at 9:00 PM PDT until Fri Aug 19 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on weekdays. Lane closures in both directions planned. Watch for traffic control personnel. Closures in place for sweeping in various locations. Watch for a slow moving vehicle and obey traffic control. Last updated Fri Aug 5 at 11:30 AM PDT. (DBC-43916) |
Highway 10 Eastbound | Highway 10, eastbound. Utility work between 172 St and 176 St for 0.2 km (Surrey). Until Fri Aug 19. From 10:00 PM to 6:00 AM PDT daily. Left turn lane closed. Centre lane blocked. Expect delays. Last updated Mon Jul 25 at 3:13 PM PDT. (DBC-43580) |
Highway 10 Eastbound | Highway 10, eastbound. Utility work between 176 St and 176A St for 0.1 km (Surrey). Until Fri Aug 19. From 10:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Mon Jul 25 at 3:05 PM PDT. (DBC-43577) |
Highway 10 Westbound | Highway 10, westbound. Utility work between 176A St and 176 St for 0.1 km (Surrey). Until Fri Aug 19. From 10:00 AM to 6:00 AM PDT daily. Watch for traffic control. Last updated Mon Jul 25 at 3:05 PM PDT. (DBC-43579) |
Highway 10 | Highway 10. Maintenance planned between Smith Cres and Glover Rd for 0.7 km (Langley - District). Starting Mon Sep 12 at 9:00 AM PDT until Sun Sep 18 at 3:00 PM PDT. Lane Closure. Last updated Tue Aug 9 at 3:51 PM PDT. (DBC-44039) |
Highway 101 Both Directions | Highway 101, in both directions. Road construction work between Crowe Rd and Maskell Rd for 0.9 km (6 km east of Sechelt to 5 km west of Gibsons). Until Mon Oct 10 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Last updated Fri Mar 25 at 10:56 AM PDT. (DBC-39334) |
Highway 11 | Highway 11. Maintenance between McClary Ave and Delair Rd (Abbotsford). Right lane closed. Work is at Sumas Way and involves replacing flags. Last updated Thu Jun 2 at 3:12 PM PDT. (DBC-41783) |
Highway 11 Southbound | Highway 11, southbound. Construction work at Valley Rd (Abbotsford). Until Thu Sep 15. Expect delays. All lanes to remain open. A speed reduction will be in place. Watch for signs. Last updated Fri Aug 5 at 9:12 AM PDT. (DBC-43908) |
Highway 15 Southbound | Highway 15, southbound. Construction work between 88 Ave and 80 Ave (Surrey). Until Thu Sep 15. From 9:00 AM to 3:00 PM PDT daily. Watch for traffic control. Dike upgrades along the Serpentine River. Trucks entering and exiting the site at times along the West side of Highway 15. Last updated Wed May 11 at 1:54 PM PDT. (DBC-40932) |
Highway 17 Both Directions | Highway 17, in both directions. Construction work between 92nd Street and 96th Street. Until Wed Nov 30. Lane closures in both directions planned. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:19 AM PDT. (DBC-21374) |
Highway 17 | Highway 17. Utility work between 72 St and 80 St Conn for 2.0 km (Delta). Until Tue Aug 30. From 6:30 PM to 5:30 AM PDT daily. Right lane closed. Watch for traffic control. Last updated Thu Jun 16 at 10:47 AM PDT. (DBC-42326) |
Highway 17 Westbound | Highway 17, westbound. Paving operations between Highway 91 Connector and Aldrich Rd (Delta). Until Mon Aug 15. From 3:00 AM to 5:00 PM PDT on Friday and Saturday. Last updated Tue Aug 9 at 2:16 PM PDT. (DBC-44034) |
Highway 17 Both Directions | Highway 17, in both directions. Road maintenance work at Highway 91 Connector (Delta). Until Wed Aug 31. From 9:30 AM to 3:00 PM PDT daily. Shoulder closed. Watch for traffic control. Closures will tentatively be needed approximately weekly during the period noted above. Maximum, 3x weekly, minimum, twice monthly. Last updated Thu Jun 16 at 4:23 PM PDT. (DBC-42339) |
Highway 17 Eastbound | Highway 17, eastbound. Road maintenance work between Highway 91 Connector and Tannery Rd for 6.9 km (Delta to Surrey). Until Wed Aug 31. From 9:30 AM to 3:00 PM PDT daily. Centre lane closed. Watch for traffic control. Closures will tentatively be needed approximately weekly during the period noted above. Maximum, 3x weekly, minimum, twice monthly. Last updated Thu Jun 16 at 4:28 PM PDT. (DBC-42340) |
Highway 17 | Highway 17. Construction work between Highway 91 Connector and Grace Rd (Delta). Until Wed Nov 30. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:20 AM PDT. (DBC-23431) |
Highway 17 Westbound | Highway 17, westbound. Stalled vehicle between Grace Rd and Highway 91 Connector (Delta). Right lane closed. Expect delays. Last updated Mon Aug 15 at 7:51 AM PDT. (DBC-44178) |
Highway 3 | Highway 3. Road sweeping between Exit 177 and Sunshine Valley for 11.9 km (6 to 17 km east of Hope). From 7:00 AM to 4:00 PM PDT on Monday and Tuesday. Expect delays. Last updated Mon Jun 6 at 7:03 AM PDT. (DBC-41881) |
Highway 3 | Highway 3. Paving operations at Manning Park Resort (64 km east of Hope). Until Tue Aug 30 at 8:00 PM PDT. Lane Closure. Expect delays up to 20 minutes. Last updated Sat Jun 11 at 9:55 AM PDT. (DBC-42125) |
Highway 3 Westbound | Highway 3, westbound. Utility work planned between Tower Rd and Owl Way for 15.8 km (63 to 48 km west of Princeton). Starting Wed Aug 24 until Thu Aug 25. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Right lane will be closed. Expect delays. Last updated Mon Jul 4 at 12:19 PM PDT. (DBC-42854) |
Highway 3 Westbound | Highway 3, westbound. Utility work planned between Garret Rd and Tower Rd for 1.2 km (46 to 47 km west of Princeton). Starting Wed Aug 24 until Thu Aug 25. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Right lane will be closed. Watch for traffic control personnel. Last updated Mon Jul 4 at 12:22 PM PDT. (DBC-42856) |
Highway 5 Northbound | Highway 5, northbound. Maintenance between the start of Highway 5 and Exit 192 for 15.4 km (Hope). Until Fri Aug 26 at 9:00 PM PDT. Lane Closure. Last updated Wed Jul 27 at 12:58 PM PDT. (DBC-43653) |
Highway 5 Northbound | Highway 5, northbound. Industrial traffic may slow or block regular traffic. Between Exit 183: Othello Rd and Exit 192 for 9.0 km (6 to 15 km north of Hope). Until Sat Sep 3. From 6:00 AM to 9:00 PM PDT daily. Last updated Wed Aug 3 at 4:11 PM PDT. (DBC-43843) |
Highway 5 Southbound | Highway 5, southbound. Construction work between Exit 202: Portia and Exit 200: Shylock Rd for 1.8 km (12 to 11 km south of Great Bear Snowshed). Until Thu Sep 15. From 7:00 AM to 5:30 PM PDT on weekdays. Watch for traffic control. Expect delays. Last updated Thu Aug 4 at 10:11 AM PDT. (DBC-43867) |
Highway 7 Westbound | Highway 7, westbound. Road maintenance work between Grand St and Wardrop St for 0.5 km (Mission). Right lane closed. Watch for traffic control. Preparation work for mural painting. Last updated Fri May 27 at 5:49 PM PDT. (DBC-41548) |
Highway 7 Westbound | Highway 7, westbound. Construction work between Horne St and James St (Mission). Shoulder closed. Construction will take place on 1st Ave (Hwy 7). Last updated Fri Aug 5 at 4:05 PM PDT. (DBC-43929) |
Highway 7 Both Directions | Highway 7, in both directions. Utility work planned between Beaudry Rd and Beach Camp Rd for 1.9 km (6 to 4 km west of Kent). Starting Mon Aug 29 until Fri Sep 9. From 9:00 AM to 7:00 PM PDT daily. Expect delays. Watch for traffic control personnel. Crews will be working on the shoulder. Last updated Thu Jul 28 at 9:36 AM PDT. (DBC-43679) |
Highway 9 Southbound | Highway 9, southbound. Utility work planned between Bristol Dr and Tuyttens Rd for 0.2 km (Kent). Starting Tue Aug 16 until Fri Aug 19. From 10:00 AM to 4:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane will be closed. Expect delays. Last updated Mon Aug 8 at 10:33 AM PDT. (DBC-43978) |
Highway 9 Northbound | Highway 9, northbound. Construction work between McPherson Rd and Ramona Pl for 0.7 km (Kent to Harrison Hot Springs). Until Mon Aug 15 at 5:00 PM PDT. Work is for installing a concrete pad for a new bus shelter. Last updated Fri Aug 5 at 3:31 PM PDT. (DBC-43928) |
Highway 91 Northbound | Highway 91, northbound. Construction work between Exit 6: 72 Ave and Exit 8: Nordel Way (Delta). Until Wed Nov 30. Exit ramp is closed. Expect delays. Watch for traffic control. All traffic bound for Nordel way will use the Nordel way westbound loop ramp. Last updated Mon Mar 14 at 9:26 AM PDT. (DBC-21272) |
Highway 91 Both Directions | Highway 91, in both directions. Construction work between Alex Fraser Bridge and Exit 6: 72 Ave for 3.2 km (Delta). Until Wed Nov 30. Lane closures in both directions planned. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:27 AM PDT. (DBC-21376) |
Highway 91 Northbound | Highway 91, northbound. Construction work between Exit 1 and Exit 4: Kittson Pky (Delta). Until Fri Aug 19. From 7:00 AM to 5:30 PM PDT daily. Shoulder closed. Trucks will be accessing gravel road. Last updated Fri Aug 12 at 2:39 PM PDT. (DBC-44141) |
Highway 91 Both Directions | Highway 91, in both directions. Road sweeping planned between Exit 15 and the end of Highway 91 for 12.8 km (Delta to Richmond). Starting Mon Aug 15 at 9:00 PM PDT until Fri Aug 19 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on weekdays. Lane closures in both directions planned. Watch for traffic control personnel. Closures in place for sweeping in various locations. Watch for a slow moving vehicle and obey traffic control. Last updated Fri Aug 5 at 11:29 AM PDT. (DBC-43915) |
Highway 91A Both Directions | Highway 91A, in both directions. Road sweeping planned between the start of Highway 91A and the end of Highway 91A for 3.5 km (New Westminster). Starting Mon Aug 15 at 9:00 PM PDT until Fri Aug 19 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on weekdays. Lane closures in both directions planned. Watch for traffic control personnel. Closures in place for sweeping in various locations. Watch for a slow moving vehicle and obey traffic control. Last updated Fri Aug 5 at 11:37 AM PDT. (DBC-43919) |
Highway 99 Southbound | Highway 99, southbound. Road construction work at Exit 10 (Surrey). Until Fri Dec 23 at 5:00 PM PDT. Entrance ramp closed. Right lane closed. Shoulder closed. Watch for traffic control. Hwy 99 Exit 10 southbound to King George Blvd closed. Detour via Elgin Rd / Nicomekl Rd. Right lane of Hwy 99 Exit 10 and King George Blvd intersection closed. Last updated Thu Mar 31 at 12:08 PM PDT. (DBC-39534) |
Highway 99 Both Directions | Highway 99, in both directions. Road sweeping planned between Exit 10 and Exit 32: Steveston Hwy for 21.9 km (Surrey to Richmond). Starting Mon Aug 15 at 9:00 PM PDT until Fri Aug 19 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on weekdays. Lane closures in both directions planned. Watch for traffic control personnel. Closures in place for sweeping in various locations. Watch for a slow moving vehicle and obey traffic control. Last updated Fri Aug 5 at 11:40 AM PDT. (DBC-43920) |
Highway 99 Southbound | Highway 99, southbound. Construction work between Exit 28 and 112 St for 8.0 km (Delta). Until Fri Sep 30. From 10:00 PM to 9:00 AM PDT daily. Right lane closed. Speed reduction zone 60km/hour 24 hours a day. Last updated Wed Jul 6 at 4:52 PM PDT. (DBC-42973) |
Highway 99 Both Directions | Highway 99, in both directions. Mowing between Exit 3: Horseshoe Bay Junction and Alpha Lake Rd for 94.3 km (West Vancouver to Whistler). From 7:00 AM to 3:30 PM PDT on weekdays. Lane Closure. Slow moving mowing and sweeping. Please use caution. Last updated Fri Aug 5 at 9:25 AM PDT. (DBC-43909) |
Highway 99 Both Directions | Highway 99, in both directions. Utility work between Lions Bay Ave and Brunswick Beach Rd (Lions Bay). Until Fri Aug 26. From 9:00 AM to 12:00 PM PDT on Friday and from 9:00 AM to 4:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect delays. Watch for traffic control. Crews will be working in the curb lane both directions. Last updated Wed Jul 6 at 4:54 PM PDT. (DBC-42974) |
Highway 99 Both Directions | Highway 99, in both directions. Utility work between Lions Bay Ave and Brunswick Beach Rd for 1.9 km (Lions Bay). Until Fri Sep 16. From 9:00 AM to 4:00 PM PDT on weekdays. Right lane closed. Last updated Thu Aug 4 at 4:13 PM PDT. (DBC-43884) |
Highway 99 Both Directions | Highway 99, in both directions. Paving operations between Sea View Dr and Copper Dr for 4.8 km (7 to 2 km south of Squamish). Until Tue Aug 16. From 7:30 AM to 7:00 PM PDT on weekdays. Lane Closure. Expect delays. Single lane traffic in both direction. Northbound traffic will be diverted into the Southbound left lane at the Highway 99 / Furry Creek interchange. Please use caution and obey all signage. Last updated Mon Aug 15 at 7:30 AM PDT. (DBC-44094) |
Highway 99 | Highway 99. Road maintenance work between Sea View Dr and Murrin Lake Provincial Pk for 7.8 km (Squamish). Lane Closures: NB lane shift to SB left lane. Left lane closure: Britannia Chainup south to bottom of Furry Creek across from Furry Creek NB onramp. NB lane closure with Lane Shift to left SB lane at the NB Onramp to Hwy 99 at Furry Creek. Britannia: Single Lane Alternating Traffic, 10 min delays: 8am-12pm. Last updated Sun Aug 14 at 5:53 PM PDT. (DBC-44165) |
Highway 99 Southbound | Highway 99, southbound. Construction work at Cleveland Ave (Squamish). Until Tue Aug 30. From 9:00 AM to 4:00 PM PDT on weekdays. Right lane closed. Expect delays. Last updated Tue Aug 2 at 10:24 AM PDT. (DBC-43787) |
Highway 99 Both Directions | Highway 99, in both directions. Bridge maintenance between Alice Lake Rd and Daisy Lake Rd for 11.5 km (8 km south of Whistler to 1 km north of Squamish). Until Fri Aug 19 at 6:30 PM PDT. Last updated Sun Aug 14 at 5:24 PM PDT. (DBC-44164) |
Highway 99 Both Directions | Highway 99, in both directions. Utility work between Emerald Dr and Riverside Dr for 5.8 km (Whistler). Until Fri Sep 9. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Speed will be reduced to 60 km/h. Last updated Thu Jul 28 at 2:23 PM PDT. (DBC-43686) |
Highway 99A Both Directions | Highway 99A, in both directions. Bridge maintenance between Nicomekl Rd and South Surrey Park And Ride for 0.3 km (Surrey). Until Fri Sep 30. Expect delays. Watch for traffic control. Crews will be working in the right lane, 24hrs a day. Last updated Tue Aug 9 at 12:26 PM PDT. (DBC-44027) |
Morris Valley Rd Both Directions | Morris Valley Rd, in both directions. Bridge construction at Chehalis River Bridge. Until Wed Aug 17. From 8:00 AM to 7:00 PM PDT on weekdays. Expect delays. Single lane alternating traffic. Please use caution. Watch for traffic control personnel. Last updated Fri Aug 12 at 8:09 AM PDT. (DBC-44122) |
Other Roads Both Directions | Highway 91 Connector, in both directions. Construction work between 96th Street and Nordel Interchange. Until Wed Nov 30. Lane closures in both directions planned. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Lane shift at Hwy91C EB. Last updated Mon Mar 7 at 6:10 AM PST. (DBC-21375) |
Other Roads Northbound | King George Blvd., northbound. Bridge construction at Nicomekl Bridge. Right lane closed. Expect delays. Last updated Sat May 7 at 4:48 PM PDT. (DBC-34994) |
Other Roads Both Directions | 96th Street, in both directions. Road construction work between BNSF Rail Crossing and Highway 17. Until Thu Sep 1 at 7:00 AM PDT. Road closed. 96th Street south of the BNSF Rail Crossing was permanently closed Dec 2021 to allow for construction of a new interchange at Hwy 17/Hwy 91 Connector. 96th St will remain open for local traffic. A new cul-de-sac will be installed by summer 2022. Last updated Mon Mar 14 at 9:32 AM PDT. (DBC-35551) |
Other Roads Both Directions | Chancellor Blvd , in both directions. Utility work between Western Pkwy and Newton Crescent. Until Fri Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Expect delays. Last updated Fri Apr 15 at 2:54 PM PDT. (DBC-40027) |
Other Roads | 200 St.. Paving operations between 88 Ave. And 86 Ave. Until Fri Aug 19 at 5:00 AM PDT. Lane Closure. Pavement marking layout and installation. Last updated Fri Jul 29 at 4:23 PM PDT. (DBC-43723) |
Other Roads | 200 St.. Paving operations planned between 88 Ave. E and 86 Ave. Starting Fri Aug 19 at 8:00 PM PDT until Sun Aug 21 at 6:00 AM PDT. Lane Closure. Pavement Marking layout and installation. Last updated Fri Jul 29 at 4:43 PM PDT. (DBC-43728) |
Other Roads | ROCKWELL DR. Pothole repair between ROCKWELL DR and ROCKWELL LANE near Harrison Hot Springs. Single lane alternating traffic. Last updated Sun Jul 31 at 10:54 AM PDT. (DBC-43750) |
Other Roads Both Directions | W 16th Ave, in both directions. Utility work between Blanca St and Wesbrook Mall. Until Wed Aug 31. From 9:00 AM to 5:00 PM PDT daily. Expect delays. Watch for traffic control. There will be a left lane closure within the roundabout at Wesbrook. Last updated Fri Aug 12 at 2:59 PM PDT. (DBC-44143) |