Below are the current road condition alerts on provincially maintained highways in Southwestern British Columbia. This area includes the following border crossings: Point Roberts, Peace Arch, Blaine / Surrey, Lynden / Aldengrove, and Sumas / Huntingdon.
When you finish with this page, go back to the British Columbia Road Conditions Menu to review other road and traffic condition sources we have collected. Also, be sure to review our information on going through customs, required documentation and prohibited items.
Text List of Travel Issues Along the Washington / British Columbia Border
This list is provided by the Province of British Columbia and shows road conditions, traffic incidents, events, and major construction that impact the provincial roadways.
Highway 1 Both Directions | Highway 1, in both directions. Road construction work between Ainslie Rd N and Kanaka Station Rd for 16.1 km (Jackass Mountain Summit). Watch for traffic control. Expect delays. Loads over 3.8 metres in width restricted. Road open with sections of single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Fri Jul 8 at 12:15 AM PDT. Last updated Thu Jul 7 at 12:01 AM PDT. (DBC-35355) |
Highway 15 Both Directions | Highway 15, in both directions. Bridge construction between 176 St and 57 Ave (Surrey). Until Tue Nov 15 at 5:00 PM PDT. Lane closures in both directions in effect. Watch for traffic control. Expect delays. Northbound structure closed. Traffic reduced to a single lane in each direction on the southbound structure. Next update time Tue Nov 15 at 9:00 AM PDT. Last updated Mon Jun 27 at 1:09 PM PDT. (DBC-42673) |
Highway 1 Westbound | Highway 1, westbound. Construction work between Exit 7: Westridge Ave and Almondel Rd (West Vancouver). Until Tue Sep 6. From 7:00 AM to 7:00 PM PDT daily. Watch for traffic control. Westmount Road off ramp closure. Last updated Thu May 5 at 10:08 AM PDT. (DBC-40690) |
Highway 1 Eastbound | Highway 1, eastbound. Construction work between Almondel Rd and Exit 7: Westridge Ave (West Vancouver). Until Tue Jul 26. From 10:00 PM to 5:00 AM PDT daily. Watch for traffic control. Intermittent lane closures. Last updated Tue May 24 at 12:04 PM PDT. (DBC-41383) |
Highway 1 Westbound | Highway 1, westbound. Construction work between Exit 8: Cypress Bowl Rd and Exit 7: Westridge Ave for 1.5 km (West Vancouver). Until Wed Nov 16. From 10:00 PM to 5:00 AM PDT on weekdays. Expect minor delays. Watch for traffic control. Last updated Fri Jun 3 at 9:26 AM PDT. (DBC-41811) |
Highway 1 Eastbound | Highway 1, eastbound. Maintenance between Exit 7: Westridge Ave and Exit 8: Cypress Bowl Rd (West Vancouver). Until Tue Jul 26 at 5:00 AM PDT. Lane Closure. Last updated Fri Jun 10 at 1:43 PM PDT. (DBC-42102) |
Highway 1 Westbound | Highway 1, westbound. Construction work at Exit 8: Cypress Bowl Rd (West Vancouver). Until Sat Jul 16. From 7:00 AM to 7:00 PM PDT daily. Watch for traffic control. Cypress Bowl on ramp closure. Last updated Thu May 5 at 10:05 AM PDT. (DBC-40689) |
Highway 1 Westbound | Highway 1, westbound. Maintenance between Exit 8: Cypress Bowl Rd and Exit 7: Westridge Ave for 1.6 km (West Vancouver). Until Wed Nov 16 at 5:00 AM PDT. Lane Closure. Last updated Fri Jun 10 at 8:54 AM PDT. (DBC-42089) |
Highway 1 Eastbound | Highway 1, eastbound. Construction work between Exit 150: 160 St and Exit 53: 176th St / Highway 15 for 3.3 km (Surrey). Until Thu Jul 7 at 7:00 AM PDT. Shoulder closed. Last updated Wed Jul 6 at 2:36 AM PDT. (DBC-39454) |
Highway 1 Both Directions | Highway 1, in both directions. Construction work at Exit 58: 200 St (Langley - District). Until Fri Jul 15. Lane Closure. Work will be completed in phases to ensure two lanes remain open in each direction on 200th street and full access to the Highway 1 off-ramps, some delays should be expected. For more information: https://news.Gov.Bc.Ca/releases/2021TRAN0185-002391. Next update time Fri Jul 15 at 8:00 AM PDT. Last updated Fri Jul 1 at 10:33 AM PDT. (DBC-38632) |
Highway 1 Eastbound | Highway 1, eastbound. Line painting planned between Exit 58: 200 St and 202 St (Langley - District). Starting Fri Jul 8 at 8:00 PM PDT until Sat Jul 9 at 7:00 AM PDT. Lane Closure. Watch for traffic control personnel. Last updated Tue Jul 5 at 11:54 AM PDT. (DBC-42906) |
Highway 1 Eastbound | Highway 1, eastbound. Construction work between Exit 58: 200 St and 202 St for 0.2 km (Langley - District). Until Fri Jul 8. From 8:00 PM to 5:00 AM PDT on Wednesday, Thursday and Friday. Lane Closure. Watch for traffic control. Last updated Tue Jul 5 at 11:52 AM PDT. (DBC-42905) |
Highway 1 Westbound | Highway 1, westbound. Utility work between 248 St and Exit 66: 232nd St for 0.2 km (Langley - District). Until Sat Jul 30 at 5:00 AM PDT. Shoulder closed. Watch for traffic control. Last updated Fri Jun 17 at 9:26 AM PDT. (DBC-42363) |
Highway 1 Eastbound | Highway 1, eastbound. Utility work between Exit 66: 232nd St and 248 St for 0.1 km (Langley - District). Until Sat Jul 30 at 5:00 AM PDT. Shoulder closed. Watch for traffic control. Last updated Fri Jun 17 at 9:28 AM PDT. (DBC-42364) |
Highway 1 | Highway 1. Shoulder maintenance between Exit 73 and Exit 90: McCallum Rd for 16.7 km (Abbotsford to Langley - District). Until Thu Jul 7 at 5:00 AM PDT. Crews shoulder mowing, watch for slow moving vehicles. Last updated Wed Jul 6 at 9:26 PM PDT. (DBC-42983) |
Highway 1 Eastbound | Highway 1, eastbound. Paving operations between Annis Rd and Exit 135 for 6.1 km (Chilliwack). Until Sat Jul 9 at 6:00 AM PDT. Watch for lane closures, and ON/OFF ramp closures. Follow the construction and detour signs. Obey the traffic controllers. Expect delays. Last updated Sun Jul 3 at 10:26 PM PDT. (DBC-42681) |
Highway 1 Eastbound | Highway 1, eastbound. Road maintenance work between Exit 135 and Exit 138: Bridal Falls Rd for 1.5 km (4 to 5 km east of Chilliwack). Until Thu Jul 7 at 5:00 AM PDT. Lane Closure. Last updated Wed Jul 6 at 8:17 PM PDT. (DBC-42980) |
Highway 1 Both Directions | Highway 1, in both directions. Utility work between Exit 151: Peters Rd and Exit 160: Hunter Creek Rd for 2.2 km (7 to 9 km west of Hope). Until Fri Jul 15 at 4:00 PM PDT. Right lane closed. Shoulder closed. Watch for traffic control. Expect delays. Last updated Tue Jun 21 at 11:28 AM PDT. (DBC-42479) |
Highway 1 Westbound | Highway 1, westbound. Utility work between Exit 165: Flood Rd and Exit 160: Hunter Creek Rd for 4.7 km (Hope). Until Fri Jul 15. From 6:00 AM to 7:00 PM PDT daily. Lane Closure. Expect delays. Speed reduction to 80 km/hr always. Last updated Wed Jun 29 at 12:24 PM PDT. (DBC-42747) |
Highway 1 Eastbound | Highway 1, eastbound. Utility work between Exit 160: Hunter Creek Rd and Exit 165: Flood Rd for 4.7 km (Hope). Until Fri Jul 15. From 6:00 AM to 7:00 PM PDT on weekdays and Saturday. Centre lane closed. Expect delays. Speed reduction to 80km/hr always. Last updated Wed Jun 29 at 12:30 PM PDT. (DBC-42748) |
Highway 1 Both Directions | Highway 1, in both directions. Utility work between Exit 160: Hunter Creek Rd and Exit 165: Flood Rd (Hope). Until Fri Jul 15. From 9:00 AM to 4:00 PM PDT on weekdays. Right lane is closed in both directions. Expect delays. Last updated Fri May 20 at 4:52 PM PDT. (DBC-41303) |
Highway 1 Both Directions | Highway 1, in both directions. Bridge construction between Regent St and Toll Rd (Yale). Until Mon Oct 31. Road construction work. Single lane alternating traffic. Expect delays. Watch for traffic control. Speed reduced to 30km/h. Last updated Tue Mar 15 at 10:51 AM PDT. (DBC-38962) |
Highway 1 Both Directions | Highway 1, in both directions. Utility work planned between Skalula Cres and Johnson Rd for 0.3 km (13 km north of Yale). Starting Tue Jul 19 at 9:00 AM PDT until Tue Jul 19 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays. Speed reduction to 50 km/hr. Last updated Tue Jul 5 at 12:49 PM PDT. (DBC-42909) |
Highway 1 Northbound | Highway 1, northbound. Utility work planned between Boston Bar Station Rd and Kahmoose Rd for 11.7 km (26 to 14 km south of Jackass Mountain Summit). Starting Mon Jul 11 until Thu Jul 28. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Expect delays. Possible single lane alternating traffic. Speed limit reduced to 60 km/hr. Last updated Thu Jun 30 at 11:45 AM PDT. (DBC-42782) |
Highway 1 Northbound | Highway 1, northbound. Utility work planned between Boston Bar Station Rd and Jackass Summit for 27.5 km (Jackass Mountain Summit). Starting Wed Jul 13 until Fri Jul 22. From 7:30 AM to 3:30 PM PDT daily. Right lane will be closed. Expect delays. Last updated Wed Jul 6 at 9:09 AM PDT. (DBC-42940) |
Highway 10 Both Directions | Highway 10, in both directions. Construction work between Worrell Cres and 216 St for 1.0 km (Langley - District). Until Fri Jul 15. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure. Expect minor delays. Last updated Mon Jun 6 at 11:46 AM PDT. (DBC-41904) |
Highway 10 Eastbound | Highway 10, eastbound. Utility work between 232 St and 72 Ave (Langley - District). Until Sat Jul 30 at 5:00 AM PDT. Shoulder closed. Watch for traffic control. Last updated Fri Jun 17 at 9:22 AM PDT. (DBC-42362) |
Highway 101 Both Directions | Highway 101, in both directions. Road construction work between Crowe Rd and Maskell Rd for 0.9 km (6 km east of Sechelt to 5 km west of Gibsons). Until Mon Oct 10 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Last updated Fri Mar 25 at 10:56 AM PDT. (DBC-39334) |
Highway 11 | Highway 11. Maintenance between McClary Ave and Delair Rd (Abbotsford). Right lane closed. Work is at Sumas Way and involves replacing flags. Last updated Thu Jun 2 at 3:12 PM PDT. (DBC-41783) |
Highway 15 Southbound | Highway 15, southbound. Construction work between 88 Ave and 80 Ave (Surrey). Until Thu Sep 15. From 9:00 AM to 3:00 PM PDT daily. Watch for traffic control. Dike upgrades along the Serpentine River. Trucks entering and exiting the site at times along the West side of Highway 15. Last updated Wed May 11 at 1:54 PM PDT. (DBC-40932) |
Highway 17 Both Directions | Highway 17, in both directions. Construction work between 92nd Street and 96th Street. Until Wed Nov 30. Lane closures in both directions planned. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:19 AM PDT. (DBC-21374) |
Highway 17 Both Directions | Highway 17, in both directions. Maintenance planned between 72 St and 104 Ave for 20.4 km (Delta to Surrey). Starting Sun Jul 10 at 7:00 PM PDT until Tue Jul 12 at 5:00 AM PDT. Lane Closure. Last updated Wed Jun 29 at 5:01 PM PDT. (DBC-42763) |
Highway 17 | Highway 17. Utility work between 72 St and 80 St Conn for 2.0 km (Delta). Until Tue Aug 30. From 6:30 PM to 5:30 AM PDT daily. Right lane closed. Watch for traffic control. Last updated Thu Jun 16 at 10:47 AM PDT. (DBC-42326) |
Highway 17 Both Directions | Highway 17, in both directions. Road maintenance work at Highway 91 Connector (Delta). Until Wed Aug 31. From 9:30 AM to 3:00 PM PDT daily. Shoulder closed. Watch for traffic control. Closures will tentatively be needed approximately weekly during the period noted above. Maximum, 3x weekly, minimum, twice monthly. Last updated Thu Jun 16 at 4:23 PM PDT. (DBC-42339) |
Highway 17 Eastbound | Highway 17, eastbound. Road maintenance work between Highway 91 Connector and Tannery Rd for 6.9 km (Delta to Surrey). Until Wed Aug 31. From 9:30 AM to 3:00 PM PDT daily. Centre lane closed. Watch for traffic control. Closures will tentatively be needed approximately weekly during the period noted above. Maximum, 3x weekly, minimum, twice monthly. Last updated Thu Jun 16 at 4:28 PM PDT. (DBC-42340) |
Highway 17 | Highway 17. Construction work between Highway 91 Connector and Grace Rd (Delta). Until Wed Nov 30. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:20 AM PDT. (DBC-23431) |
Highway 17 Eastbound | Highway 17, eastbound. Maintenance between Tannery Rd and Bridgeview Dr for 1.4 km (Surrey). Until Thu Jul 7 at 6:00 AM PDT. Left lane is blocked. Watch for traffic control. Last updated Wed Jul 6 at 5:58 PM PDT. (DBC-42977) |
Highway 17 Westbound | Highway 17, westbound. Maintenance between Old Yale Rd and Grace Rd for 0.8 km (Surrey). Until Thu Jul 7 at 5:00 AM PDT. Right lane closed. Watch for traffic control. Last updated Wed Jul 6 at 5:59 PM PDT. (DBC-42978) |
Highway 17 Both Directions | Highway 17, in both directions. Maintenance planned at 136 St (Surrey). Starting Fri Jul 8 at 7:00 PM PDT until Tue Jul 12 at 5:00 AM PDT. Lane Closure. Last updated Wed Jun 29 at 5:34 PM PDT. (DBC-42762) |
Highway 17A Northbound | Highway 17A, northbound. Utility work between 28 Ave Overpass and 34B Ave for 1.4 km (Delta). Until Mon Aug 1. From 7:00 PM to 5:00 AM PDT daily. Watch for traffic control. Lane Closure. Last updated Mon May 9 at 5:29 PM PDT. (DBC-40824) |
Highway 17A Northbound | Highway 17A, northbound. Maintenance between 34B Ave and 62B St for 1.8 km (Delta). Until Fri Jul 15 at 5:00 AM PDT. Lane Closure. Last updated Wed Apr 27 at 3:51 PM PDT. (DBC-40405) |
Highway 3 Eastbound | Highway 3, eastbound. Road construction work between the start of Highway 3 and Exit 173: Old Hope Princeton Way (Hope). Until Thu Jul 7 at 5:00 AM PDT. Lane Closure. Last updated Wed Jul 6 at 8:18 PM PDT. (DBC-42981) |
Highway 3 | Highway 3. Road sweeping between Exit 177 and Sunshine Valley for 11.9 km (6 to 17 km east of Hope). From 7:00 AM to 4:00 PM PDT on Monday and Tuesday. Expect delays. Last updated Mon Jun 6 at 7:03 AM PDT. (DBC-41881) |
Highway 3 Both Directions | Highway 3, in both directions. Utility work between Sunshine Valley and Tower Rd for 63.1 km (17 km east of Hope to 47 km west of Princeton). Until Fri Jul 22 at 4:00 PM PDT. Single lane alternating traffic. Hazard tree removal. Watch for and obey traffic control personnel. There will be no work after 12 Noon before a long weekend, or on the Monday following one. Last updated Fri Jun 24 at 3:11 PM PDT. (DBC-42602) |
Highway 3 | Highway 3. Paving operations at Manning Park Resort (64 km east of Hope). Until Tue Aug 30 at 8:00 PM PDT. Lane Closure. Expect delays up to 20 minutes. Last updated Sat Jun 11 at 9:55 AM PDT. (DBC-42125) |
Highway 3 Westbound | Highway 3, westbound. Utility work planned between Tower Rd and Owl Way for 15.8 km (63 to 48 km west of Princeton). Starting Wed Aug 24 until Thu Aug 25. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Right lane will be closed. Expect delays. Last updated Mon Jul 4 at 12:19 PM PDT. (DBC-42854) |
Highway 3 Westbound | Highway 3, westbound. Utility work planned between Garret Rd and Tower Rd for 1.2 km (46 to 47 km west of Princeton). Starting Wed Aug 24 until Thu Aug 25. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Right lane will be closed. Watch for traffic control personnel. Last updated Mon Jul 4 at 12:22 PM PDT. (DBC-42856) |
Highway 3 | Highway 3. Road sweeping between Thistle Rd and Saturday Creek for 15.8 km (32 to 48 km west of Princeton). Until Wed Jun 29. From 8:00 AM to 3:30 PM PDT on Monday, Tuesday and Wednesday. Single lane alternating traffic. Last updated Thu Jun 23 at 7:57 AM PDT. (DBC-42558) |
Highway 5 Northbound | Highway 5, northbound. Maintenance between the start of Highway 5 and Exit 192 for 10.5 km (Hope to 11 km north of Hope). Until Thu Aug 4 at 9:00 PM PDT. Last updated Thu Jun 30 at 4:22 PM PDT. (DBC-42789) |
Highway 5 Southbound | Highway 5, southbound. Pothole repair between Exit 192 and Exit 183: Othello Rd (6 km north of Hope). Right lane closed. Last updated Tue Jul 5 at 2:46 AM PDT. (DBC-42879) |
Highway 7 Eastbound | Highway 7, eastbound. Utility work between Ottawa St and Pitt River Bridge for 0.4 km (Port Coquitlam). Until Fri Jul 8 at 6:00 PM PDT. Right lane closed. Shoulder closed. Watch for traffic control. Expect delays. Last updated Mon Jun 27 at 11:45 AM PDT. (DBC-42669) |
Highway 7 Westbound | Highway 7, westbound. Special event planned between Grand St and Wardrop St for 0.2 km (Mission). Starting Fri Jul 8 at 9:30 AM PDT until Fri Jul 8 at 5:00 PM PDT. Right lane will be closed. Lane closure is for the painting of a mural on the retaining wall. Last updated Wed Jun 8 at 4:16 PM PDT. (DBC-42016) |
Highway 7 Westbound | Highway 7, westbound. Road maintenance work between Grand St and Wardrop St for 0.5 km (Mission). Right lane closed. Watch for traffic control. Preparation work for mural painting. Last updated Fri May 27 at 5:49 PM PDT. (DBC-41548) |
Highway 7 | Highway 7. Special event planned between Wardrop St and Grand St for 0.5 km (Mission). Starting Fri Jul 15 at 9:30 AM PDT until Fri Jul 15 at 5:00 PM PDT. Right lane will be closed. Lane closure is for the painting of a mural on the retaining wall. Last updated Wed Jun 8 at 4:18 PM PDT. (DBC-42017) |
Highway 7 Westbound | Highway 7, westbound. Special event planned between Grand St and Wardrop St for 0.5 km (Mission). Starting Fri Jul 22 at 9:30 AM PDT until Fri Jul 22 at 5:00 PM PDT. Right lane will be closed. Lane closure is for the painting of a mural on the retaining wall. Last updated Wed Jun 8 at 4:21 PM PDT. (DBC-42019) |
Highway 7 Westbound | Highway 7, westbound. Special event planned between Grand St and Wardrop St for 0.5 km (Mission). Starting Fri Jul 29 at 9:30 AM PDT until Fri Jul 29 at 5:00 PM PDT. Right lane will be closed. Lane closure is for the painting of a mural on the retaining wall. Last updated Wed Jun 8 at 4:24 PM PDT. (DBC-42020) |
Highway 7 Westbound | Highway 7, westbound. Maintenance between Horne St and James St for 0.2 km (Mission). Until Fri Jul 15 at 6:00 PM PDT. Right lane closed. Watch for traffic control. Last updated Wed Jun 29 at 12:32 PM PDT. (DBC-42749) |
Highway 7 Both Directions | Highway 7, in both directions. Roadside brushing between Beach Camp Rd and Fielder Rd for 4.3 km (Kent). Until Thu Jul 7. From 7:00 AM to 4:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jul 5 at 7:27 AM PDT. (DBC-42888) |
Highway 7 Both Directions | Highway 7, in both directions. Road construction work between Chawathil Rd and Ross Rd for 6.0 km (Hope). Until Tue Aug 2. From 7:00 AM to 7:00 PM PDT daily. Watch for traffic control. Development of Chawathil band lands. Speed reduction in place. No work to take place on July 1 or Aug 1. Last updated Mon Jun 13 at 9:13 AM PDT. (DBC-42163) |
Highway 7 Both Directions | Highway 7, in both directions. Road maintenance work planned between Chawathil Rd and Ross Rd for 7.2 km (Hope). Starting Mon Jul 11 until Fri Jul 15. From 7:00 AM to 4:00 PM PDT on weekdays. Lane closures in both directions planned. Highway 1 junction to Camp Hope. Last updated Wed Jul 6 at 4:01 PM PDT. (DBC-42970) |
Highway 91 | Highway 91. Maintenance at Alex Fraser Bridge (Delta). Until Sun Jul 31 at 9:00 PM PDT. Detour in effect. Watch for traffic control. Crews will have the west sidewalk closed for sidewalk painting, pedestrians will be detoured to the east sidewalk. Last updated Thu Jun 2 at 5:45 AM PDT. (DBC-41737) |
Highway 91 Northbound | Highway 91, northbound. Construction work between Exit 6: 72 Ave and Exit 8: Nordel Way (Delta). Until Wed Nov 30. Exit ramp is closed. Expect delays. Watch for traffic control. All traffic bound for Nordel way will use the Nordel way westbound loop ramp. Last updated Mon Mar 14 at 9:26 AM PDT. (DBC-21272) |
Highway 91 Both Directions | Highway 91, in both directions. Construction work between Alex Fraser Bridge and Exit 6: 72 Ave for 3.2 km (Delta). Until Wed Nov 30. Lane closures in both directions planned. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:27 AM PDT. (DBC-21376) |
Highway 99 Southbound | Highway 99, southbound. Road construction work at Exit 10 (Surrey). Until Fri Dec 23 at 5:00 PM PDT. Entrance ramp closed. Right lane closed. Shoulder closed. Watch for traffic control. Hwy 99 Exit 10 southbound to King George Blvd closed. Detour via Elgin Rd / Nicomekl Rd. Right lane of Hwy 99 Exit 10 and King George Blvd intersection closed. Last updated Thu Mar 31 at 12:08 PM PDT. (DBC-39534) |
Highway 99 Southbound | Highway 99, southbound. Construction work between Exit 28 and 112 St for 8.0 km (Delta). Until Fri Sep 30. From 10:00 PM to 9:00 AM PDT daily. Right lane closed. Speed reduction zone 60km/hour 24 hours a day. Last updated Wed Jul 6 at 4:52 PM PDT. (DBC-42973) |
Highway 99 Southbound | Highway 99, southbound. Construction work planned at Exit 28 (Delta). Starting Thu Jul 7 at 7:00 PM PDT until Fri Jul 8 at 5:00 AM PDT. Expect delays. Southbound off ramp closed. Local detour available. Last updated Wed Jul 6 at 12:06 PM PDT. (DBC-42955) |
Highway 99 Both Directions | Highway 99, in both directions. Mowing between Ansell Pl and Alpha Lake Rd for 89.5 km (West Vancouver to Whistler). Until Fri Jul 8. From 7:00 AM to 3:30 PM PDT on weekdays. Watch for slow moving vehicle. Last updated Mon Jul 4 at 3:26 PM PDT. (DBC-42869) |
Highway 99 Both Directions | Highway 99, in both directions. Utility work between Lions Bay Ave and Brunswick Beach Rd (Lions Bay). Until Fri Aug 26. From 9:00 AM to 12:00 PM PDT on Friday and from 9:00 AM to 4:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect delays. Watch for traffic control. Crews will be working in the curb lane both directions. Last updated Wed Jul 6 at 4:54 PM PDT. (DBC-42974) |
Highway 99 Northbound | Highway 99, northbound. Road maintenance work planned between Brunswick Beach Rd and Porteau Cove Rd (8 km north of Lions Bay). Starting Thu Jul 7 at 7:00 AM PDT until Thu Jul 7 at 3:30 PM PDT. Left lane will be blocked. Last updated Tue Jul 5 at 4:56 PM PDT. (DBC-42919) |
Highway 99 Southbound | Highway 99, southbound. Maintenance at Cleveland Ave (Squamish). Until Sat Jul 30. From 9:00 AM to 4:00 PM PDT on weekdays. Right lane closed. Watch for traffic control. Last updated Mon Jun 13 at 10:42 AM PDT. (DBC-42172) |
Highway 99 Both Directions | Highway 99, in both directions. Utility work between Blueberry Dr and Brio Entrance (Whistler). Until Thu Jul 7. From 7:00 AM to 11:00 PM PDT on weekdays. Work on shoulder. Last updated Wed Jul 6 at 5:22 PM PDT. (DBC-42866) |
Highway 99 Both Directions | Highway 99, in both directions. Utility work between Alpha Lake Rd and Whistler-Cay Dr for 7.8 km (Whistler). Until Fri Jul 22 at 4:00 PM PDT. Lane Closure. Last updated Thu Jun 16 at 1:41 PM PDT. (DBC-42333) |
Morris Valley Road | Morris Valley Road . Maintenance at Chehalis River Hatchery. Until Fri Jul 29 at 6:00 PM PDT. Lane Closure. Last updated Wed Jun 29 at 12:36 PM PDT. (DBC-42328) |
Morris Valley Road | Morris Valley Road . Road construction work between Hemlock Valley Road and Highway 7, at the Chehalis River Bridge. Until Fri Jul 8 at 6:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Additional work will be taking place on Friday July 1 and Saturday July 2 without any impact to traffic. Last updated Wed Jun 29 at 12:18 PM PDT. (DBC-42367) |
Other Roads Both Directions | Highway 91 Connector, in both directions. Construction work between 96th Street and Nordel Interchange. Until Wed Nov 30. Lane closures in both directions planned. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Lane shift at Hwy91C EB. Last updated Mon Mar 7 at 6:10 AM PST. (DBC-21375) |
Other Roads Northbound | King George Blvd., northbound. Bridge construction at Nicomekl Bridge. Right lane closed. Expect delays. Last updated Sat May 7 at 4:48 PM PDT. (DBC-34994) |
Other Roads Both Directions | 96th Street, in both directions. Road construction work between BNSF Rail Crossing and Highway 17. Until Thu Sep 1 at 7:00 AM PDT. Road closed. 96th Street south of the BNSF Rail Crossing was permanently closed Dec 2021 to allow for construction of a new interchange at Hwy 17/Hwy 91 Connector. 96th St will remain open for local traffic. A new cul-de-sac will be installed by summer 2022. Last updated Mon Mar 14 at 9:32 AM PDT. (DBC-35551) |
Other Roads Both Directions | Chancellor Blvd , in both directions. Utility work between Western Pkwy and Newton Crescent. Until Fri Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Expect delays. Last updated Fri Apr 15 at 2:54 PM PDT. (DBC-40027) |
Other Roads Westbound | Cypress Bowl Rd, westbound. Utility work planned between Deer Ridge Rd and Burfield Pl. Starting Mon Jul 18 at 6:00 AM PDT until Fri Jul 22 at 5:00 PM PDT. Right turn lane will be closed. Left turn lane will be closed. Watch for traffic control personnel. Expect delays. Last updated Fri Jun 10 at 4:30 PM PDT. (DBC-42111) |
Other Roads | Portage Road. Utility work planned between Tiyata Blvd and Frontier Street. Starting Thu Jul 7 at 9:00 AM PDT until Fri Jul 8 at 3:00 PM PDT. Expect minor delays. Last updated Thu Jun 30 at 4:16 PM PDT. (DBC-42788) |
Other Roads Both Directions | 200th Street, in both directions. Paving operations between 88 Ave E and 88 Ave W in Langley - District. Until Fri Jul 8. From 8:00 AM to 5:00 PM PDT on weekdays. Lane closures in both directions in effect. Expect delays. Last updated Tue Jul 5 at 12:15 PM PDT. (DBC-42907) |
Other Roads Both Directions | 200th Street, in both directions. Paving operations planned between 88 Ave E and 88 Ave W in Langley - District. Starting Fri Jul 8 until Sat Jul 9. From 8:00 AM to 6:00 PM PDT on Friday and Saturday. Lane closures in both directions planned. Expect delays. Last updated Tue Jul 5 at 12:24 PM PDT. (DBC-42908) |
Other Roads Both Directions | Copper Drive, in both directions. Utility work planned between Main Street and Creekside Drive. Starting Thu Jul 7 at 7:00 AM PDT until Thu Jul 7 at 7:00 PM PDT. Lane Closure. Last updated Wed Jul 6 at 4:57 PM PDT. (DBC-42975) |